When established schools see student counts rise, they often turn to portable classrooms. Facing just that issue, Highpoint Elementary School elected to build an addition with precast, prestressed concrete. The total precast annex added 22,000 sq. ft. of classrooms, bathrooms and administrative areas to the school on a 17-day erection schedule.

Details

Owner: Fulton County Board of Education
Architect:
Gardner, Spencer, Smith, Tench & Hensley, P.C.
Engineer:
Weems Doar Engineers, Inc.
Contractor:
Hensler & Beavers General Contractors, Inc.
Location:
Atlanta, GA

Architectural

  • Provide permanent scholastic setting for students
  • New annex matches exterior of adjacent 20-year-old building with inlay brick and reveal patterns
  • Precast wall panels mimic concrete block interior of existing building

Structural

  • 121 precast pieces, including insulated wall panels, slabs and double tees
  • Electrical, mechanical and plumbing chases cast in for easy field installation and reduced field time

Construction

  • Added 22,000 sq. ft. of classrooms, bathrooms and administrative areas
  • Overcame site erection difficulties, including small footprint, traffic congestion and limited on-site parking
  • Insulated precast panels allowed contractor early interior access and building heat during winter
  • Early interior access contributed to increased speed and efficiency of other trades
  • Erected structure in 17 days during cold, wet weather in January 2007